Wednesday, August 12, 2020

ISHOF Construction Update August 13, 2020


Concrete Placement Dive Well

Hope everyone is doing well, attached is the updated look ahead for early morning concrete which we are projecting for the week of 9.4.2020. This will be a 10 hour concrete pour as we are placing the dive pool walls in one continuous pour. We will aim to start at 3am to miss the afternoon lightning and rain storms that come with working in late August/Early September. There is also a photo attached from the 8.4.2020 dive pool floor concrete pour.

We are still tracking to mobilize the steel sheet pile contractor on 8.17.2020 to begin removing the steel sheet pile from the Competition Pool now that the concrete is cured and pool piping installed. We are projecting to be noisy again from 8.17.2020 through 10.2.2020. There will be periods of just logistical moving of sheets which will not include the vibratory hammer but for the most part the 8.17-10.2.2020 time frame will be noisy from 8am to 5pm Monday through Friday. The over all goal is to have the steel sheet piles removed and off site before FLIBS starts to mobilize in early October 2020.

Kevin Curry
Project Superintendent
Hensel Phelps

No comments:

Post a Comment